01 — The problem
Why the Excel production schedule breaks on the first rush order
The planner's workbook holds capacity, changeovers and material status in color codes only they can read. One rush order means an afternoon of reshuffling, while the floor works from an outdated printout.
ERP planning modules and dedicated scheduling suites can take heavy setup to model capacity. A tool built around your own constraints sits in between.
02 — What to build
Capacity, materials and job status in one production plan
Production orders linked to customer orders, with product, quantity, due date and priority
Routings with operations per product, work center, run time per unit and changeover time
Capacity calendar per work center: shifts, planned maintenance and holidays
Material check comparing required components with stock and expected receipts, flagging shortages
Schedule board by work center with drag-to-reschedule and conflict warnings
Shop floor status (not started, running, paused, done) with completed quantity and scrap
Roles
planner, supervisors, read-only sales and plant manager
03 — How to build it
How to build a production scheduling app in Henosia
Create a private project, a sandbox where nothing goes live until you publish.
Add mock data
open orders, routings, work centers and a stock snapshot as CSV.
Connect a database so orders, operations and capacity are linked tables.
Describe your constraints in Plan mode
The agent asks clarifying questions and proposes a plan; nothing is built until you choose to build.
Build a first version and compare it with last week's plan.
Test disruptions
a rush order, a machine down, a late component.
Publish with edit rights for planners and read-only views for everyone else.
An example Plan-mode prompt:
Build a production scheduling app for 4 work centers: cutting, welding, painting, assembly.
Each product has a routing with run time per unit and changeover time; two 8-hour shifts, Monday to Friday.
Schedule by due date and priority, but never start an order with short components; flag it instead.
Group painting jobs by color where due dates allow, since dark-to-light changeovers add 45 minutes.
Supervisors update status and quantity; sales sees expected finish dates only.Paste it into a private Henosia project in Plan mode. The agent asks questions and proposes a plan first.
04 — Before you go live
Connecting the production plan to live orders and stock
- Source of truth: orders and stock usually live in your ERP. Start with CSV snapshots, move to a read-only connection, and write production orders back only after testing. Scope each integration per system, data direction and access level.
- Data owner: run times and changeovers need one owner; a plan is only as good as those numbers.
- Rules and AI: keep stable constraints as fixed scheduling rules. AI can suggest resequencing options after a breakdown, but the planner approves.
- Publishing: decide who may release a schedule change once the floor works from it.
Customer orders can come from an order management app, and component availability from inventory management.
Start a private project in Henosia and plan your first schedule.
Start a private project05 — FAQ
Frequently asked questions
What is production planning software?
Production planning software converts customer demand into a plan for what to make, when and on which equipment. It checks capacity and material availability, sequences jobs, and shows status as work moves across the shop floor. A custom version models your own routings, shifts and changeover rules.
What is the difference between production planning and production scheduling?
Production planning decides what to produce and in what quantities over a period, based on demand, capacity and materials. Production scheduling sets the exact sequence and timing of each job on each work center. Most small manufacturers need both in one tool, with scheduling as the daily view.
Do I need developers to build manufacturing scheduling software?
Not for a first version. A planner can describe routings, shifts and rules in Plan mode and build without writing code themselves. Involve IT when you connect live ERP data, let the app write production orders back or decide who approves publishing.
Who can change the production schedule and see order data?
You decide per role. Henosia Authentication ties apps to your company email domain and supports app-level access and optional IP restriction. Typically planners edit, supervisors update status and sales only views dates. Confirm your specific security requirements with Henosia before live order data goes in.